Increased productivity through continuous improvement in quality in the sub data processing unit in a company courier: the case Peru Courier

Authors

  • Walter Antonio Ramos Martel Universidad Inca Garcilaso de la Vega. Lima, Perú.

DOI:

https://doi.org/10.15381/idata.v16i2.11922

Keywords:

Reprocessing, delay, quality, productivity, six sigma

Abstract

The problems in the present investigation were the reprocessing and claims for delay; causing low quality, which could be affecting the productivity. Therefore it was necessary to apply a methodology of process improvement, based on tools and statistical thinking, being the Six Sigma methodology and its phases (Define, measure, analyze, improve and Control) the best adapted to the case study. After applying the first three phases of this methodology and to be a non-experimental research is determined that the quality improved and productivity also increased, taking a positive economic impact.

Downloads

Download data is not yet available.

Author Biography

  • Walter Antonio Ramos Martel, Universidad Inca Garcilaso de la Vega. Lima, Perú.

    Ingeniero Industrial de la UIGV

Downloads

Published

2013-12-18

Issue

Section

Producción y Gestión

How to Cite

Increased productivity through continuous improvement in quality in the sub data processing unit in a company courier: the case Peru Courier. (2013). Industrial Data, 16(2), 59-66. https://doi.org/10.15381/idata.v16i2.11922