Application of Lean Manufacturing Tools (5S, Andon and Standard Time) to Increase Productivity in the Production Area of a Metalworking Company
DOI:
https://doi.org/10.15381/idata.v26i1.24580Keywords:
Lean Manufacturing, 5S, Andon, Standard Time, Value Stream MapAbstract
This research focuses on the analysis of the causes of low productivity in the production area of a metalworking company. It also aims to implement Lean Manufacturing tools (5S, Andon and standard time) to increase the company’s productivity. The insertion of these tools begins with an initial diagnosis by means of a value stream map. It is followed by the identification of root causes, the implementation of the tools and the evaluation of results in a period from April to September 2022. The final results were an increase in average productivity, which went from 0.26 tn/soles to 0.33 tn/soles, that is to say, the increase in productivity was achieved in the company under study.
Downloads
Downloads
Published
Issue
Section
License
Copyright (c) 2023 Jose Andres Bravo Fernandez
This work is licensed under a Creative Commons Attribution 4.0 International License.
AUTHORS RETAIN THEIR RIGHTS:
a. Authors retain their trade mark rights and patent, and also on any process or procedure described in the article.
b. Authors retain their right to share, copy, distribute, perform and publicly communicate their article (eg, to place their article in an institutional repository or publish it in a book), with an acknowledgment of its initial publication in the INDUSTRIAL DATA.
c. Authors retain theirs right to make a subsequent publication of their work, to use the article or any part thereof (eg a compilation of his papers, lecture notes, thesis, or a book), always indicating the source of publication (the originator of the work, journal, volume, number and date).