Regrind of mixed zinc concentrator plant mining Society Austria Duvaz SAC

Authors

  • David Vílchez Palomares Asist. Spte. Planta Conc Soc. Minera Austria Duvaz
  • Alberto Medina Ureta Graduated, EAP Metallurgical Engineering, UNMSM
  • Cesar Coronel Tineo Graduated, EAP Metallurgical Engineering, UNMSM

DOI:

https://doi.org/10.15381/iigeo.v13i26.431

Keywords:

regrinding of mixed, zinc flotation, grinding optimization, load balancing

Abstract

At present most of the zinc flotation circuits of the peruvian mining remilling circuit feature, it can be closed when the remillings return to the general feed of flotation and open when remillings are floated in a cleaner- scavenger stage and the tails go directly to the tailings. This work was carried out on a mill Eagle 4'x 6" with 1.11 in the reduction radius of circuit, was thusable to increase zinc recovery by 2%, with a payback in a period of approximately 3 months.

Downloads

Published

2010-12-15

Issue

Section

Artículos científicos

How to Cite

Vílchez Palomares, D., Medina Ureta, A., & Coronel Tineo, C. (2010). Regrind of mixed zinc concentrator plant mining Society Austria Duvaz SAC. Revista Del Instituto De investigación De La Facultad De Minas, Metalurgia Y Ciencias geográficas, 13(26), 59-65. https://doi.org/10.15381/iigeo.v13i26.431